GLOW Cup
News Tips
  
02

As of this week, the Trumbull Parkway Infrastructure Project is underway from East Avenue to Lown Street in the City of Batavia.

The project includes installation of a new sanitary sewer main, water services, replacing damaged sidewalks, and resurfacing the roadway. The work is expected to be complete by Sept. 19.

Given the scope of the work, sections of Trumbull Parkway will be temporarily closed to thru traffic, excluding the residents that live in the work zone. Residents that live in the work zone will be able to access their homes and driveways throughout the duration of this project.

Farwell Drive between Elm and Trumbull Parkway will be closed for the duration of the project and traffic must utilize an alternative route.

Actions: E-mail | Comments (0) RSS comment feed | Bookmark and Share

Comments

There are currently no comments, be the first to post one.

Post Comment

Name (required)

Email (required)

Enter the code shown above:

KenBarrett
Tipline
Sterling Tents
Wheels and Heels
AFC
  |  Login